News Center
-
Key Points for Renovation of Clean Rooms & Dust-Free Purification Workshops
2026/6/22
01. Preliminary Evaluation and Planning (Preconditions for Renovation) Current status inspection + demand positioning: Conduct comprehensiv...
-
Anti-freezing measures for central air conditioning in clean workshops during winter
2026/6/22
The prevention of freezing in the central air conditioning system of a cleanroom in winter should be based on the process characteristics of...
-
Precautions for installing gas pipelines
2026/6/22
Special gases (special gases) usually have characteristics such as flammability, explosiveness, toxicity, corrosiveness or high purity. The ...
-
Cleaning methods for fan coil units and handling of common faults
2026/6/11
I. Cleaning Method for Fan Coil Units (Core Steps) Stop the machine, cut off the power supply of the fan coil unit, close the correspondi...
-
Selection of flooring materials for cleanrooms
2026/6/11
The selection of flooring materials for cleanrooms should be based on five core principles: cleanliness level, anti-static requirements, res...
-
Purification Air Conditioning System Ventilation System Commissioning Plan (Reduced Version)
2026/6/11
I. Purpose of Debugging Verify the installation quality and operational stability of the system equipment, calibrate parameters such as a...




