Clean workshop electrical professional construction and installation technology
2024/10/31
Clean workshop electrical system Overview Clean workshop electrical system mainly includes power supply system, lighting system, weak current system and lightning protection grounding system. These systems need to meet the requirements for efficient, stable and safe operation of electrical equipment in clean buildings, while also meeting special standards for clean environments.
Electrical professional construction and installation process
1. Preparation before constructionBefore construction, it is necessary to conduct a detailed investigation of the construction site to understand the building structure, equipment layout and design requirements of the electrical system of the clean workshop. At the same time, it is also necessary to prepare detailed construction plans and safety measures to ensure the smooth progress of the construction process.
2. Foundation construction
Foundation construction mainly includes the manufacture and installation of cable trench, cable bridge and distribution cabinet foundation. The construction quality of these infrastructures directly affects the installation and operation of subsequent electrical equipment. Therefore, in the construction process, it is necessary to strictly abide by the relevant norms to ensure the stability and smoothness of the infrastructure.
3. Cable laying
Cable laying is the key link of electrical system construction. During the laying process, select the appropriate cable model and specification according to the design drawings, and lay the cable in the specified path. At the same time, it is also necessary to pay attention to the bending radius, fixed spacing and fire prevention measures of the cable to ensure the safe operation of the cable.
4. Install electrical equipment
The installation of electrical equipment includes the installation of switchgear, distribution box, lighting fixtures, etc. During the installation, ensure that the installation position of the device is accurate and secure, and that the device complies with related specifications. At the same time, it is also necessary to debug and test the equipment to ensure its normal operation.
5. Construction of weak current system
Weak current system includes communication, monitoring, automatic control and other systems. In the construction process, wiring, equipment installation and commissioning need to be carried out according to the design requirements. At the same time, it is also necessary to pay attention to the isolation and anti-interference measures between weak current equipment and strong current equipment to ensure the normal operation of the weak current system.
6. Lightning protection grounding
Lightning protection grounding system is an important measure to ensure the electrical safety of clean workshop. During construction, make and install the grounding network according to related regulations and ensure that the grounding resistance meets the requirements. At the same time, it is also necessary to test and check the ground system to ensure its safety and reliability. In addition, there are anti-static measures on the ground, anti-static grounding of dangerous goods warehouse.
7. System debugging and acceptance
After the completion of construction, it is necessary to carry out system debugging and acceptance work. During the commissioning process, the electrical system needs to be comprehensively inspected and tested to ensure its normal operation. During the acceptance process, it is necessary to evaluate and confirm the construction quality and equipment performance to ensure that the electrical system meets the design requirements and relevant standards.
Quality control measures during construction and installation
1. Strictly implement construction codes and standards
In the construction process, it is necessary to strictly implement the relevant construction codes and standards to ensure the construction quality and safety. At the same time, it is also necessary to strengthen the training and management of construction personnel to improve their professional skills and safety awareness.2. Strengthen material and equipment management
Material equipment is the basis of electrical system construction. In the construction process, it is necessary to strengthen the management and inspection of materials and equipment to ensure that their quality meets the requirements. At the same time, it is also necessary to standardize the storage and use of materials and equipment to avoid damage and waste.
3. Strengthen construction site management
Construction site management is the key link to ensure construction quality. In the construction process, it is necessary to strengthen the management and supervision of the construction site to ensure the standardization and standardization of the construction process. At the same time, it is also necessary to strengthen communication and coordination with other professionals to ensure the smooth progress of the construction process.
4. Strengthen quality inspection and acceptance
Quality inspection and acceptance is an important means to ensure construction quality. In the construction process, it is necessary to strengthen the inspection and acceptance of the construction quality to ensure that each construction link meets the relevant codes and standards. At the same time, it is also necessary to rectify and deal with the problems found in a timely manner to ensure the overall improvement of construction quality.
Sum up
The electrical construction and installation process of clean workshop is a complex and important task. In the construction process, it is necessary to strictly abide by the relevant norms and standards, and strengthen the management of materials and equipment, construction site management, quality inspection and acceptance. Only in this way can we ensure the normal operation of the electrical system and the efficient production of the clean workshop. In the actual construction process, we must strictly refer to the relevant contents of the "Clean Room Construction and Acceptance Code" (GB50591-2010) for construction and acceptance.