Clean workshop wall panel, roof, doors and Windows construction and installation technology

2024/10/10

As the cornerstone of the modern electronics industry, the semiconductor industry has high requirements for the cleanliness of the production environment. The decoration, building layout, design and construction of each plant system are directly 
Wall panel construction and installation technology
1. Material preparation
The selection of wallboard materials should be determined according to the cleanliness level, use environment and use function of the clean workshop. Commonly used wallboard materials include color steel plate, stainless steel plate, sandwich plate and so on. When selecting materials, it should be ensured that the cleanliness, corrosion resistance and fire resistance of the materials meet the requirements.
2. Wall board production
The production of wall panels should be carried out in a clean environment to avoid material contamination. During the production process, it should be ensured that the size, shape and flatness of the wall panel meet the design requirements. At the same time, the splicing of the wall panel should be handled smoothly and smoothly to reduce the resistance of the air flow.
3. Wall panel installation
The installation of wall panels should follow the principle of "first down and then up, first inside and then outside". First, the beam and mullion at the bottom of the wall panel are installed on the basis of the wall to ensure that the position of the beam and mullion is accurate and level. Then, the wall board is mounted on the beam and mullion piece by piece to ensure the perpendicularity and flatness of the wall board. In the installation process, special sealant should be used to seal the gap between the wall panels to ensure the air tightness of the wall.
4. Wall plate fixed
After the installation of the wall panel, the wall panel should be fixed on the beam and mullion using special fixtures or screws to ensure the stability and firmness of the wall panel. At the same time, the wall board should be regularly inspected and maintained to ensure its long-term stability and safety.
Roof construction and installation technology
1. Material preparation
The material selection of the roof should also be determined according to the cleanliness level of the clean workshop and the use environment. Commonly used roof materials include color steel plate, stainless steel plate, aluminum alloy plate and so on. When selecting materials, it should be ensured that the cleanliness, corrosion resistance and fire resistance of the materials meet the requirements.
2. Top plate making
The production of the roof should also be carried out in a clean environment to avoid contamination of the material. During the production process, it should be ensured that the size, shape and flatness of the roof meet the design requirements. At the same time, the splicing of the roof should be handled smoothly and smoothly to reduce the resistance of the air flow.
3. Install the top plate
The installation of the top plate should follow the principle of "middle first and then both sides". First, the supporting frame is installed on all sides of the plant to ensure that the position of the frame is accurate and level. Then, the roof is mounted on the supporting frame one by one to ensure the flatness and stability of the roof. During the installation process, the gap between the roof should be sealed with a special sealant to ensure the air tightness of the roof.
4. Secure the top plate
After the top plate is installed, the top plate should be fixed on the supporting frame using special fixtures or screws to ensure the stability and firmness of the top plate. At the same time, regular inspection and maintenance should be carried out on the roof to ensure its long-term stability and safety.
Doors and Windows construction and installation technology
1. Material preparation
The material selection of doors and Windows should be determined according to the cleanliness level of the clean workshop, the use environment and the use function. Commonly used door and window materials include color steel plate, stainless steel plate, glass and so on. When selecting materials, it should be ensured that the cleanliness, corrosion resistance and fire resistance of the materials meet the requirements.
2. Door and window production
The production of doors and Windows should also be carried out in a clean environment to avoid material contamination. During the production process, it should be ensured that the size, shape and flatness of the doors and Windows meet the design requirements. At the same time, the splicing of doors and Windows should be handled smoothly and smoothly to reduce the resistance of air flow.
3. Install doors and Windows
The installation of doors and Windows should follow the principle of "first door frame and then door fan". First of all, install the door frame on the wall to ensure that the position of the door frame is accurate and level. Then, install the door fan on the door frame to ensure that the door door opens and closes smoothly. During the installation process, special sealant should be used to seal the gap between the doors and Windows and the wall to ensure the air tightness of the doors and Windows.
4. Debugging doors and Windows
After the doors and Windows are installed, debugging should be carried out to ensure that the doors and Windows are opened and closed flexibly and smoothly. At the same time, regular inspection and maintenance of doors and Windows should be carried out to ensure their long-term stability and safety.

Construction and installation precautions

1. During the construction and installation process, the relevant construction specifications and operating procedures should be strictly observed to ensure the construction quality and safety.
2. The construction site should be cleaned and disinfected before construction to ensure that the cleanliness of the construction environment meets the requirements.
3. During the construction process, attention should be paid to protecting the completed works to avoid damage or pollution.
4. After the completion of construction, the whole project shall be accepted and tested to ensure that all performance indicators meet the design requirements.

Sum up

The construction and installation process of the wall panel, roof and doors and Windows of the clean workshop is the key link to ensure the cleanliness, air tightness and use function of the workshop. In the construction process, we should strictly abide by the construction specifications and operating procedures, pay attention to the selection of materials and the control of construction quality. At the same time, the protection and maintenance of the completed project should also be strengthened.