Installation Requirements and Specifications for Cleanroom Purification Color Steel Sheets
2026/11/10
Panelized purified corrugated steel sheet (flanged hand-made sheet), common thickness 50mm; panel 0.426 - 0.5mm coated steel sheet; core material rock wool / glass fiber, A-level fireproof; panel surface is flat, without scratches or paint peeling, edge sealing is intact, the cutting section must be sealed to prevent core material falling and generating dust.
Matching aluminum profiles U-shaped floor trough aluminum, ceiling trough aluminum, R50 inner arc aluminum (for cleanliness, no right-angle corners are allowed), external turning corner aluminum, three-way aluminum, door frame profiles; fasteners: rivets, expansion bolts; sealing materials: neutral purified silicone sealant, acidic glass sealant is strictly prohibited.
Placed and stored panels should be raised above the ground and protected from rain and sun; protective film should be removed after the construction is completed.
02 Pre-construction Preparation
Base floor: Try to level the floor; if the height difference is large, leveling should be done first; if the height difference is too large, the floor trough aluminum cannot be used to level.
Laying lines: Use infrared lines to lay the floor trough reference line; issue a layout plan, try to reduce on-site cutting; on-site cutting should preferentially use a toothed saw, and sanding cutting is prohibited; the cutting section must be sealed to prevent core material falling and generating dust.
Cross-operation: The clean room should wait for the civil construction to be completed before carrying out the corrugated steel sheet construction to reduce dust pollution to the panels.
03 Wall Panel System Installation
3.1 Installation of U-shaped Floor Trough Aluminum
Floor trough aluminum is arranged along the laying lines, fixed with expansion bolts, with a fixed spacing of 500 - 600mm; the floor trough aluminum at the door opening position is disconnected; uneven ground is adjusted with thin pads, it is strictly prohibited to force the bent material; the bottom gap of the floor trough is sealed with glue in the later stage; the lower end of the corrugated steel sheet is inserted into the U-shaped trough, a small expansion gap is reserved at the bottom, and it should not be pressed tightly and locked.
3.2 Installation of Wall Panels with Flanged Splicing
The first wall panel is inserted into the floor trough, the verticality is corrected by infrared lines, the verticality is ≤ 2mm/m, the full height ≤ 5mm.
The panels are inserted with the male and female flanges, the gap is controlled at 2 - 3mm, the gaps are uniform; do not use a sledgehammer to hard knock the panels, and reserve the thermal expansion and contraction gap.
If the panel is too high (> 4 meters), an intermediate connecting piece should be added every 4 - 6 meters to prevent the wall panel from bulging or concave inward.
Corner and angle: The clean room does not allow right-angle corners, R50 arc aluminum profiles are used, the spacing of the rivets is ≤ 400mm to fix the arc strip; the misalignment of the arc joint is ≤ 1mm; the external angle uses external turning corner aluminum profiles.
3.3 Construction of Door Hole
The door frame aluminum profiles are fixed first, then the hole size is checked and the panels are cut; the cutting section of the panels must be sealed; observe that the type of the surrounding profiles of the glass window is pressed tightly, continuous glue application is required, no broken glue is allowed, to prevent air leakage and dust.
3.4 Gluing and Sealing
Clean the dust and debris in the gaps before gluing;
Glue all the corners, gaps, doors, three-way corners continuously; the glue seams should be smooth, without bubbles or broken seams;
Use neutral anti-mold purified special glue, acidic glue will pollute the clean environment, it is strictly prohibited to use.
04 Installation of Ceiling Corrugated Steel Sheets
The self-weight of the ceiling panels is borne by the hanging rods and dragon bones, it is strictly prohibited to directly press the wall panels to bear the force!
Hanging rods, galvanized dragon bones, special ceiling hangers, the spacing of the hangers is ≤ 600mm; level the entire ceiling framework;
The ceiling panels are arranged with a gap, the vertical seam of the wall panel should not be aligned and connected with the gap of the ceiling panel;
The upper end of the wall panel is inserted into the ceiling trough aluminum, a small expansion gap is reserved, do not press tightly; the junction position between the wall panel and the ceiling uses three-way aluminum profiles; all the sealing glue is applied at the three-way position.
05 Quality Allowable Deviation Table
06 Control of Quality Common Problems
Panel surface scratches: Remove the protective film after the completion of the protective film; construction is prohibited from directly hitting the panel surface with a hammer;
Uneven gap size: Do not hard pry the panels, adjust the pads slightly;
Gluing defects: Broken glue, bubbles, too thick glue; clean the gap and re-glue;
On-site firework: Electric welding should be far away from the corrugated steel sheets, rock wool panels also need fire protection; do not use sanding cutting.
07 Safety Points
Indoor climbing work, set up scaffolding, do not step on the ceiling corrugated steel sheets;
Drill holes for pipelines in the panels, install protective sleeves at the hole positions; seal the edges around the holes with glue;
After installation, do not remove the protective film immediately. Wait until the overall clean-up work is nearly completed before removing the film.
08 Key Points for Completion and Acceptance Inspection
Data verification:板材 qualification certificate, fireproof test report of core material; concealed records (hanging rods, hanging pieces, floor trough fixation);
Appearance inspection: The panel surface is intact without warping; the profiles are straight; the joint seams are continuous, smooth, and without broken glue or bubbles; the arc corners are complete;
Dimensional inspection: Verticality, flatness, board seam;
Cleanliness special inspection: No visible gaps can be seen with the naked eye; third-party cleanliness inspection includes air tightness and dust particle detection.